FRN / Guides / Contract & Warranty Review
Guide · Contracts

Read it before you sign it.

A foundation repair contract should describe the problem, the design, the acceptance criteria and the warranty in terms you can check. Vague language protects the contractor. Specific language protects you.

01 / CountPiers and locations shown on a plan, not “as needed.”
02 / ProofInstallation records for every pier, delivered to you.
03 / FloridaRequired lien and recovery fund notices on residential contracts over $2,500.
01

Red flags in the fine print.

What you see
What it should say
“Piers installed as needed.”
A pier count and a plan showing where each one goes.
“Lifetime warranty.”
Whose lifetime, what is covered, what is excluded and whether it transfers to the next owner.
“Lift to maximum practical recovery.”
A stated target and an honest note that some movement cannot be fully recovered.
No depth or overage terms.
The depth the price assumes and the price per foot beyond it.
No engineering mentioned.
Who designs the repair and that the design is sealed by a licensed engineer.
No permit mentioned.
Who pulls the permit and that the work will be inspected.
Large payment up front.
A deposit sized to materials, with the balance tied to completed work.
No installation records.
A written log of depth and installation load for every pier, delivered to you.
02

What Florida requires.

Florida law puts specific notices into residential construction contracts. If they are missing, it tells you something about how the contract was put together.

  • 01
    Construction lien law noticeSection 713.015 requires a notice in direct contracts over $2,500 on residential property of up to four units, warning that unpaid subcontractors and suppliers can place a lien on your home.
  • 02
    Homeowners’ Construction Recovery Fund noticeSection 489.1425 requires a notice in residential repair contracts over $2,500 explaining that limited payment may be available from the state fund if a licensed contractor violates certain laws.
  • 03
    Construction defect notice (Chapter 558)Contracts must tell you that defect claims go through a notice and opportunity to repair process before a lawsuit.
  • 04
    The contractor’s license numberFlorida requires the license number on contracts and business documents. Check it against the state database before you sign.
This is general information, not legal advice. For a specific contract, talk to a Florida construction attorney.
03

The scope behind the signature.

  • 01
    A diagnosisThe contract should say what is causing the movement, not just what will be installed.
  • 02
    A designPier type, capacity, spacing and installation criteria, sealed by a licensed engineer for structural work.
  • 03
    Acceptance criteriaWhat load each pier is installed to and how that is verified and recorded.
  • 04
    RestorationWho repairs the slab, landscaping, finishes and utilities disturbed by the work.
  • 05
    Change ordersHow extra depth, extra piers or unforeseen conditions are priced and approved before work continues.
Ask the Network

Have a quote or contract in hand?

Tell us what you were offered and what you are seeing at the house. We read every message and reach back out.

Send a question →

The Foundation Repair Network publishes general educational information. It is not legal advice and not an engineering evaluation of any specific property. Engineering services are provided through Foundation Masters, LLC, Florida Certificate of Authorization CA# 30969.